Tuesday, March 30, 2010

Turntable Test



Alpha included, we're not cheating!

First Pass on Stag in Environment


Things to note on particular test:
  1. Needs a holdout matte for the Stag's geo. to prevent stray lines?
  2. Clipping/changing line quality on toon shader when animated
  3. Should try to see if we can control more of the glow in post, and solidity of lines in Maya

Blocking Stills

Our footage has been picked and we've blocked out the animation and have done a quick edit. Here are some sample images from our blocking:







Wednesday, March 24, 2010

Meridian Project: Film Shoot Photos

Here it is, some sample pictures from our little film shoot in South Pasadena. Photos shot by Wu Hyun Lew, a very talented motion graphics designer and animator ( http://creationlew.tumblr.com/ ). And major props to him for not only letting us borrow his Cannon 7d for night time filming, but also taking time out of his busy schedule to come out with us and help us shoot, what a guy!








Tuesday, March 23, 2010

Schedule ( weekends included guys! )

Week 10 (Mar. 22- Mar. 27)

  1. Test Shots > Nuke Checked box symbol
  2. Edit / Organize Footage > Shots Checked box symbol
  3. Track/Comp shots Checked box symbol
  4. Work out Animatic Timing Checked box symbol
- Finish modeling >

  • Stag Checked box symbol
  • Lion Checked box symbol
  • Doe Checked box symbol
  • Fawns Checked box symbol
- Start/Finish Rigging >

  • Stag Checked box symbol
  • Lion Checked box symbol
  • Doe Checked box symbol
  • Fawns Checked box symbol

Week 11 (Mar. 29- Apr. 03)
  1. Finalize Rigging Checked box symbol
  2. Animate Checked box symbol

Week 12 (Apr. 05 - Apr. 10)

  1. Revise Animation Checked box symbol
  2. Start Rendering & Maya, Nuke Checked box symbol
  3. // Start Comping! Checked box symbol
  4. //Color Correcting Footage Checked box symbol

Week 13 (Apr. 12 - Apr. 17)

  1. Finalize all animated shots Checked box symbol
  2. Finish Comping and Color Correction Checked box symbol
  3. Finish Rendering > Maya, Nuke, AE Checked box symbol

Week 14 (Apr. 19 - Apr. 24)

-Final Project is Due! (technically) Checked box symbol

Week 15 (Apr. 26 - May. 30)

-Final Project, Revised with Shot Breakdown Checked box symbol